The Union Minister of Finance announced several measures to augment road infrastructure in the Union Budget 2021-22 presented in the Parliament.
About:
An enhanced outlay of 1,18,101 crore has been provided for Ministry of Road Transport and Highways, of which 1,08,230 crore is for capital, the highest ever.
More than 13,000 km length of roads, at a cost of 3.3 lakh crore, has already been awarded under the 5.35 lakh crore Bharatmala Pariyojana project of which 3,800 kms have been constructed. By March 2022, another 8,500 kms would be awarded.
Advanced Traffic management system with speed radars, variable message signboards, GPS enabled recovery vans will be installed in all new four and six lane highways.
Dear Student,
You have still not entered your mailing address. Please enter the address where all the study materials will be sent to you. (If applicable).