Union Minister for Jal Shakti informed Rajya Sabha about the Godavari and Kaveri River Linking Project.
About:
The draft Detailed Project Report (DPR) of Godavari – Cauvery link project consisting of 3 links viz., Godavari (Inchampalli/Janampet) - Krishna (Nagarjunasagar), Krishna (Nagarjunasagar) - Pennar (Somasila) and Pennar (Somasila) – Cauvery (Grand Anicut) link projects has been completed by National Water Development Agency (NWDA).
As per the draft DPR, about 247 TMC can be diverted from Godavari river to Nagarjunsagar dam(through lifting) and further south for meeting the demands of Krishna, Pennar and Cauvery basins.
The stage of implementation of a project would be reached after DPR is prepared with the consensus of concerned States and the requisite statutory clearances are obtained.
Dear Student,
You have still not entered your mailing address. Please enter the address where all the study materials will be sent to you. (If applicable).