¯

Lower Kopili Hydroelectric Project

March 16, 2026

The Prime Minister virtually inaugurated the 120 MW Lower Kopili Hydroelectric Project recently.

About Lower Kopili Hydroelectric Project:

  • It is a 120 MW run-of-river hydropower project planned on the Kopili River basin in Assam.
  • The project is situated in the West Karbi Anglong and Dima Hasao (also known as North Cachar Hills) Autonomous District Council (ADC) areas of Central Assam.
  • The project is being developed and currently owned by Assam Power Generation Corporation Limited (APGCL).
  • It is funded by the Asian Development Bank (ADB) under its Assam Power Sector Investment Program.

Key Facts about Kopili River:

  • It is an interstate river in Northeast India that flows through Meghalaya and Assam.
  • It is the largest south bank tributary of the Brahmaputra in Assam.
  • Originating in the Meghalaya plateau, it flows through the districts of Karbi Anglong and Nagaon before merging with the Brahmaputra.

Latest Current Affairs

See All

Enquire Now