Uri-I Hydroelectric Project

Sept. 2, 2024

The Expert Appraisal Committee (EAC) of the Union Ministry of Environment, Forest and Climate Change has deferred the proposal for the grant of Environmental Clearance (EC) to the Stage-II of the Uri-I Hydroelectric Project.

About Uri-I Hydroelectric Project:

  • It is an operating hydroelectric power plant located in the Jhelum River of Uri town in the Baramulla district of Jammu & Kashmir. 
  • It is located very near the Line of Control (LOC), the de facto border between India and Pakistan.
  • The power project was commissioned in 1997 with a total installed capacity of 480 MW.
  • It is owned by the Central Government, and the operating company of the plant is National Hydroelectric Power Corporation Limited (NHPC).
  • The unit size of the power plant is 480 MW, having 4 units of 120 MW each.

Key Facts about Jhelum River:

  • It is a river that flows in India and Pakistan.
  • It is a tributary of the Indus River.
  • It is the main waterway of the Kashmir valley.
  • It is the largest and most western of the five rivers of Punjab and passes through the Jhelum District in the north of Punjab province, Pakistan.
  • Course:
    • Origin: It originates at the Verinag Spring at Anantnag, at the foot of the Pir Panjal range in the Kashmir Valley.
    • It then flows via Srinagar and Wular Lake prior to entering Pakistan.
    • The river makes a deep, narrow gorge on its way to Pakistan.
    • It joins the Chenab River near Trimmu, Pakistan.
  • Major Tributaries:
    • The largest tributary of the Jhelum is the Kishanganga (Neelum) River, which joins near Muzaffarabad and enters the Punjab province, Pakistan.  
    • Kunhar River is the second largest tributary of the river, which connects Pakistan-occupied Kashmir (PoK) and Pakistan on the Kohala Bridge of Kanghan Valley.
    • Other tributaries include the Sandran River, Bringi River, Arapath River, Watlara River, Lidder River and Veshaw River.