¯

Vishnugad Pipalkoti Hydro Electric Project (VPHEP)

Aug. 16, 2026

Seven workers were killed after a landslide triggered a massive surge of water and debris into an under-construction tunnel of the 444-MW Vishnugad-Pipalkoti Hydroelectric Project in Uttarakhand’s Chamoli district recently.

About Vishnugad Pipalkoti Hydro Electric Project (VPHEP):

  • It is a run-of-river hydropower scheme being developed on the Alaknanda River (a major tributary of the Ganga River) in the Chamoli district of Uttarakhand.
  • With an installed capacity of 444 MW (4 × 111 MW), VPHEP is designed to provide peaking power to India’s Northern Grid.
  • The project, when completed, will generate an estimated 1,665 gigawatt-hours (or million kilowatt-hours) of electricity in a typical year.
  • It is being developed by THDC India Ltd, (formerly Tehri Hydro Development Corporation Limited) and financed by the World Bank.
    • THDC is a joint venture between the government of India and the government of Uttar Pradesh.

Latest Current Affairs

See All

Enquire Now